Validation Results

Summary: CCI_COMBINED_v047_v052_ISMN_SMAP_period

  • Started validation on Oct. 23, 2020, 6:53 a.m. UTC, finished on Oct. 23, 2020, 7 a.m. UTC.
  • Compared 3 datasets:
    • Dataset 1: ESA CCI SM combined (v04.7, sm) [Filters: Variable in valid geophysical range; Data with no inconsistencies detected (flag = 0); ]
    • Dataset 2: ESA CCI SM combined (v05.2, sm) [Filters: Variable in valid geophysical range; ]
    • Reference: ISMN (20191211 global, soil_moisture) [Filters: Variable in valid geophysical range; Quality flag is "good" (G); Use measurements at given depth: 0.00,0.10; Use ISMN networks: AMMA-CATCH,BIEBRZA-S-1,BNZ-LTER,CARBOAFRICA,COSMOS,CTP-SMTMN,DAHRA,FLUXNET-AMERIFLUX,FMI,FR-Aqui,HOBE,iRON,LAB-net,MySMNet,OZNET,PBO-H2O,REMEDHUS,RISMA,RSMN,SCAN,SMOSMANIA,TERENO,USCRN,WEGENERNET,WSMN; ]
  • Validated globally.
  • Validation period / temporal filter: April 1, 2015, midnight UTC to Dec. 31, 2019, 11:59 p.m. UTC.
  • Validation metrics calculated from absolute values.
  • Triple collocation analysis was activated.
  • Scaling reference: ISMN (20191211 global, soil_moisture) [Filters: Variable in valid geophysical range; Quality flag is "good" (G); Use measurements at given depth: 0.00,0.10; Use ISMN networks: AMMA-CATCH,BIEBRZA-S-1,BNZ-LTER,CARBOAFRICA,COSMOS,CTP-SMTMN,DAHRA,FLUXNET-AMERIFLUX,FMI,FR-Aqui,HOBE,iRON,LAB-net,MySMNet,OZNET,PBO-H2O,REMEDHUS,RISMA,RSMN,SCAN,SMOSMANIA,TERENO,USCRN,WEGENERNET,WSMN; ]
  • Scaling method: Mean/standard deviation.
  • Processing took 6 minutes (wall time).
  • 0% (0 of 1382) of the processed locations (grid points) produced errors during calculation.
  • This result was published on zenodo with DOI 10.5281/zenodo.4120185.

Summary statistics

The mean, median and standard deviation are calculated on the validation results aggregated by metric and dataset. The reference dataset used is ISMN (20191211 global, soil_moisture).

Metric Mean Median IQ range Dataset
# observations 667.7 626.0 596.0 All datasets
Bias (difference of means) [m³/m³] -6.18e-10 7.22e-10 2.09e-08 1-ESA_CCI_SM_combined (v04.7)
Spearman's rho [-] 5.31e-01 5.84e-01 3.17e-01 2-ESA_CCI_SM_combined (v05.2)
Spearman's rho [-] 5.06e-01 5.54e-01 3.28e-01 1-ESA_CCI_SM_combined (v04.7)
Spearman's rho p-value [-] 1.93e-02 0.e+00 6.42e-17 2-ESA_CCI_SM_combined (v05.2)
Spearman's rho p-value [-] 2.02e-02 1.18e-43 1.17e-14 1-ESA_CCI_SM_combined (v04.7)
Pearson's r p-value [-] 2.16e-02 0.e+00 9.38e-17 2-ESA_CCI_SM_combined (v05.2)
Pearson's r p-value [-] 2.24e-02 1.40e-45 2.83e-15 1-ESA_CCI_SM_combined (v04.7)
Mean square error variance [(m³/m³)²] 1.03e-17 3.82e-18 1.25e-17 2-ESA_CCI_SM_combined (v05.2)
Mean square error variance [(m³/m³)²] 8.77e-18 2.95e-18 9.58e-18 1-ESA_CCI_SM_combined (v04.7)
Mean square error correlation [(m³/m³)²] 4.05e-03 3.07e-03 3.34e-03 2-ESA_CCI_SM_combined (v05.2)
Mean square error correlation [(m³/m³)²] 4.28e-03 3.31e-03 3.74e-03 1-ESA_CCI_SM_combined (v04.7)
Unbiased root-mean-square deviation [m³/m³] 6.e-02 5.76e-02 3.25e-02 1-ESA_CCI_SM_combined (v04.7)
Mean square error bias [(m³/m³)²] 5.07e-16 1.09e-16 4.09e-16 1-ESA_CCI_SM_combined (v04.7)
Mean square error bias [(m³/m³)²] 5.68e-16 1.08e-16 4.43e-16 2-ESA_CCI_SM_combined (v05.2)
Mean square error [(m³/m³)²] 4.28e-03 3.31e-03 3.74e-03 1-ESA_CCI_SM_combined (v04.7)
Residual sum of squares [(m³/m³)²] 2.78e+00 1.75e+00 3.07e+00 2-ESA_CCI_SM_combined (v05.2)
Residual sum of squares [(m³/m³)²] 2.98e+00 1.91e+00 3.32e+00 1-ESA_CCI_SM_combined (v04.7)
Root-mean-square deviation [m³/m³] 5.83e-02 5.54e-02 3.03e-02 2-ESA_CCI_SM_combined (v05.2)
Root-mean-square deviation [m³/m³] 6.e-02 5.76e-02 3.25e-02 1-ESA_CCI_SM_combined (v04.7)
Pearson's r [-] 5.36e-01 5.98e-01 3.23e-01 2-ESA_CCI_SM_combined (v05.2)
Pearson's r [-] 5.11e-01 5.59e-01 3.24e-01 1-ESA_CCI_SM_combined (v04.7)
Bias (difference of means) [m³/m³] -1.47e-09 -4.26e-10 2.09e-08 2-ESA_CCI_SM_combined (v05.2)
Mean square error [(m³/m³)²] 4.05e-03 3.07e-03 3.34e-03 2-ESA_CCI_SM_combined (v05.2)
Unbiased root-mean-square deviation [m³/m³] 5.83e-02 5.54e-02 3.03e-02 2-ESA_CCI_SM_combined (v05.2)
Error standard deviation [m³/m³] 6.67e-03 5.22e-03 6.53e-03 2-ESA_CCI_SM_combined (v05.2)
Error standard deviation [m³/m³] 1.12e-02 9.50e-03 1.02e-02 1-ESA_CCI_SM_combined (v04.7)
TC scaling coefficient [m³/m³] 5.37e-01 5.88e-01 3.31e-01 2-ESA_CCI_SM_combined (v05.2)
TC scaling coefficient [m³/m³] 5.65e-01 6.28e-01 3.28e-01 1-ESA_CCI_SM_combined (v04.7)
Signal-to-noise ratio [db] 1.1e+01 1.05e+01 6.47e+00 1-ESA_CCI_SM_combined (v04.7)
Signal-to-noise ratio [db] 1.54e+01 1.56e+01 8.38e+00 2-ESA_CCI_SM_combined (v05.2)

Result files

#
Description goes here
#
Description goes here